A Spectacular 1,2 Kilometer Long Work Train: The PM 1000 URM by EURAILPOOL

State-of-the-art technology for subgrade rehabilitation. Europe's largest supplier of MFS (material conveyor and hopper units) and loading systems. PM 1000 URM – the new standard in subgrade rehabilitation

– Up to 100% recycling of the existing ballast material
– Creation of a new supporting layer using existing material
– Lower disposal costs
– Up to 50% fewer logistical pauses than existing systems
– Higher track availability thanks to shorter periods in possession
– Rehabilitation capacity of up to 1400 metres per day
– 3 excavation chains
– Simultaneous installation of 2 geoplastics possible
– Installation of supporting and protective layer in one operation
– Rehabilitation capacity of up to 120 m/h and up to 1400 m/day
– Ballast recycling with high-pressure washing
– Short set-up times



Source: Eurailpool