Design for a residential development which responds to the ever increasing risk of flood in the town of Thamesmead, whilst creating a sustainable development that goes some way to reconnecting the fragmented areas of the town and giving the area a sense of identity.
This is proposed as a possible way to avoid the construction of future defences such as the Thames barrier by reinstating the natural floodplain in a way that can mitigate the flood risk to a wide area.
Source: Rebecca Lee
This is proposed as a possible way to avoid the construction of future defences such as the Thames barrier by reinstating the natural floodplain in a way that can mitigate the flood risk to a wide area.
Source: Rebecca Lee
No comments :
Post a Comment